WE Report

Report








NO RISK

Person responsible:
Phil Hardy

Report No.

WE/MoC-14-2024


Approved

Approved

Location/Facility

May Need to be notified

Date Originated

2024/07/12
1 year ago

Deadline Passed

2024/08/13
1 year ago

Closed Date

2024/08/13
Closed 1 year ago
[frm-days-diff start='13/08/2024' finish='13/08/2024']

Minor
in

Replacement of Airbus L1 to S-92 Helicopter for the PL1086 Falstaff
Due to the reduced capacity of Sikorsky S-92 helicopter for operation on NCS, the Falstaff project secured a contract with CHC to use an Airbus L1 helicopter for personnel transport. The L1 helicopter do have weight restrictions and must reduce numbers of PAX to 11-12 per flight to compensate for the long flight distance. This will require 1 flight a day for 3 days and 2 flights a day for 2 days all weeks during operations.

CHC have now confirmed that we will have a dedicated Sikorsky S-92 helicopter available for the duration of the DNO Falstaff project and the agreement for use of the Airbus L1 helicopter no longer is required.

Introducing the Sikorsky S-92 helicopter will reduce number of required flights based on no restrictions to weight and the PAX capacity can be set to 16-19 PAX. Expected S-92 flights per week will be 4.

The change from Airbus L1 to Sikorsky S-92 is marginally more costly, but the risk level will be reduced based on less total flight time for the duration of the Falstaff project. This will also have a positive impact of the reputation as the S-92 helicopter is the standardised helicopter transport for offshore personnel on the NCS.

  • Regulations & mitigating measures (0)

    No Risk Assessment

    Has been Approved

    Compensating Measures

    Introducing S-92 will reduce numbers of flights (Round trips) by 3 per week.

    Who needs to be notified?

    Authorities, partners, internal:

    Safety reps and Union reps of change, ref information meeting held regarding L1 helicopter in June.

Actions


ACTION A-6820

Action for ID241 / 14:14:08 - 08.10.2024 / tommy.skjolde@wellexpertise.com


Deadline was:

Reduced flights per day will reduce exposure to total flight hours in project.



  • Risk Assessment

    Risk Not Acceptable

    Risk Mitigation
    Must be Evaluated

    Acceptable Risk

    Probability and Impact of Event

    PROBABILITY / LIKELIHOOD OF EVENT
    C Term In Industry Terms Percentage Chance of Occurence Frequency of Occurence
    A Very Unlikely to occur Never heard of in industry 5% Once in 10 years
    B Unlikely to occur Has occured in industry 5% - 20% Once in 5 years
    C Likely to occur Incident could occur in North Sea Area 20% - 50% Once in 2 years
    D Very likely to occur Incident could occur during our operations 50% - 80% 2 times per year
    E Almost certain to occur Incident could happen more than once during this operation 80% Once a month
    IMPACT / CONSEQUENCE OF EVENT
    C Term Well Control People Environmental Damage Asset Damage Reputation Damage
    1 Very low impact Negligible First Aid Required Oil 100 litre
    Black 10 litre
    Red 1m3
    Yellow 10m3
    Green 100m3
    1 day lost time
    Less than 1MNOK
    Information only to authorities. No further discussion.
    2 Low Impact Non Classified Restricted Work Case / Medical Treatment Case Oil 100 litre
    Black 10 litre
    Red 1m3
    Yellow 10m3
    Green 100m3
    1 day lost time
    1 MNOK to 5 MNOK
    Operator in dialog with authorities. No mention of Wellesley.
    3 Medium Impact Regular Well Control Incidents Lost Time Incident / Reportable Incident Oil 1m3
    Black 100 litre
    Red 10m3
    Yellow 100m3
    Green 1000m3
    3 days lost time
    5 MNOK to 10 MNOK
    Operator investigated by authorities. No mention of Wellesley.
    4 High Impact Serious Well Control Incidents Likely Permanent Disability Oil 100m3
    Black 1m3
    Red 100m3
    Yellow 1000m3
    Green 10000m3
    14 days lost time
    10 MNOK to 30 MNOK
    Local media coverage. Wellesley included in coverage or approached by authorities.
    5 Very High Impact Critical Well Control Incidents Single or Multiple Fatalities Oil 1000m3
    Black 10m3
    Red 1000m3
    Yellow 10000m3
    Green 100000m3
    30 days lost time
    More than 30 MNOK
    National coverage. Wellesley included in coverage.


Document is not signed.

Not verified

Verification and Approval can be the same person depending upon Risk.